top of page

Nabiac Water Treatment Plant
The Nabiac Water Treatment plant was completed in 2018. It is a new purpose built 24ML per day plant treated raw water provided from a network of ground water bores. The project included the construction of a 70m x 15m plant building to facilitate the operation of the Primary and secondary Membrane filtration units, backwash systems, auto filtration, and chemical dosing for the plant including ACH, Fluoride, Gas Chlorination, Potassium Permanganate, as well as secondary transfer pump stations, 10 ML Reservoir, Lime silo, Administration building, all associated pipeworks, roadworks, electrical and control systems.

IMG_6483

IMG_6484

IMG_6485

IMG_6483
1/7
bottom of page